The survey and slope band analysis was done in 2019.The tree report was done in 2019.There was a preliminary plan designed for the location. Soil and Geology were done and submitted to the department of building and safety of the city of Los Angeles and received approval for construction. The water connection fee was also paid to the DWP. All documents above will show that these vacant lots are buildable. They are also available for the buyer to review, but the buyer must revisit and update all documents.