20 +/- acres of Class 1 - Vina Loam on Highway 99E north of Chico, southeast of Red Bluff. Two water sources. A 12” cased well drilled in 2015 and completed to 250’. The well needs pump & motor. The second water source is the Los Molinos Mutual Water Company via buried pipeline. The field is ready to be farmed after Seller removed the previous prune orchard several years ago and ripped the field. The topography is level and could be flood irrigated.
Continue Reading >>
Contact Development/Agent
Cissy Tang
TEL: (+1)626 9868****
Please enter your nationality
+87
Cannot be empty
Email address is invalidEmail address not authenticated!