Detailed Introduction Of This Home
This mobil home has several renovation!! In 2017 new floor was instelled and the mobile home was all painted. In the same year the city put individual gas and electricity, and the drainage and gas pipes were fixed. In May 2024 the bathroom was repaird, a new door, a kitchen hood and a new window was installed. Two air conditioning units were installed in the rooms. Tha house was all painted again inside ad outside. New wood was insulated on the outside and it was painted.